Monday, December 26, 2011
Pope Christmas Party.
Isaac's senior project
Isaac's brilliance

So this is the first semester that Isaac didn't work 3-4 days a weeks (He still worked 1 day down at the Hill Air Force base) and pulled 5 A's in his engineering classes. We are so proud of him. He worked very hard and he deserved the A's. He completed his senior project this semester as well doing a wind turbine. (I'll probably do a small blog on that as well).


I wanted to share with everyone the brilliance of my husband. After we completed the shed this summer we could no longer install the gate the way it was before because the shed was in the way. We had to change the side the gate closed on. However, our house was in the way. Not sure if you can see it through a picture so I'll try to explain to you what he did. He had to bend the gate latch on a 90 degree angle, but then it was hard to open and he needed more leverage. So with an extra curtain rod newell he attached to the latch with a bolt and now it looks better than it did before. (sorry if none of this makes sense, just know that Isaac is Awesome!)

Project:The shed
This summer we built a shed. The big reason why we decided to build the shed is because we had a lot of stone and 5 windows leftover from building our house. We needed to use em' or lose em'. To me they were too valuable to just throw away so onto building a shed we went. We started the shed in June and had it completed by the end of August. I realized that we never took any pictures of this project and so I am finally taking a picture of this project. We have enjoyed this addition to our house and it turned out better than we pictured.
Above: This is the upper floor of the shed that we use for storage. It is about 5 ft clearance to walk through. There is a set of doors (about 2'x 4') that we can someday use for a slide or a zip line.
Below:These are the steps to go up to the top part of the shed. Isaac did a great job designing the steps. By turning the steps and adding a plank, it makes a lot safer stairway for the kiddos.
We put up some shelves with some of our scrap lumber.


This is looking inside the shed. For Isaac's birthday I bought him some tools for his workbench. He got a drill press, a vise, hack saw, wood files, planer, pegboard organization, clamps, nail sets, and whatever else my mind cannot think of. Basically he has a pretty good start to do the basic building projects.
Saturday, October 9, 2010
Our little boy full of discoveries!
Go Aggies!
Thursday, June 3, 2010
Project: wall
So I decided to add a wall in the front room and create two seperate areas.
The first area is the sitting area for when visiting teachers come to visit that measures about 11'x15', and the second area is... where the new play room is that measures about 15'x15'. The nice thing about this addition is that we can take it down someday and have our big front room back when we want to and when we have more space with the basement.
We built shelving space for all of the toys and the kids have loved it! Lincoln especially loves it cause he can see most of the toys. The first day we had it like this he was getting out all of the toys to play with them. He does very well at cleaning up after himself lately though. With all of this new toy space it clears up the space in the closest that used to have the toys in it.
The pictures below shows the old toy room.
This is now what used to be the play room. It is now the "quiet" room and Lincoln's future bedroom. We will eventually put the beds together and make a bunk bed to make more floor space.


Below is Lincoln's bedroom before and below to the right is Lincoln's "new" bedroom and the baby's future bedroom.

Below is Lincoln's bedroom before and below to the right is Lincoln's "new" bedroom and the baby's future bedroom.
Subscribe to:
Posts (Atom)